Meanwhile, up front in the living bit, the fittings have all been ripped out and the scuzzy plywood in the Luton has been stripped out - all things considered, not bad for two days work!
So at the end of day two we’re pretty much down to the metal frame in the living part of the horsebox. It was more of a mission than we’d anticipated, but I was very relieved to see that the water damage caused by the leaking roof was minimal - there’s a small hole in the floor down in the corner but that’s easily fixed