Meanwhile, up front in the living bit, the fittings have all been ripped out and the scuzzy plywood in the Luton has been stripped out - all things considered, not bad for two days work!
Spent some more time working in the horsebox today - not sure it was a good idea to let Dad loose with the disk grinder, but nothing caught fire so that was a bonus!
So at the end of day two we’re pretty much down to the metal frame in the living part of the horsebox. It was more of a mission than we’d anticipated, but I was very relieved to see that the water damage caused by the leaking roof was minimal - there’s a small hole in the floor down in the corner but that’s easily fixed